Smart Cleaning forms, field by field
Every field on the Cleaning Task, Build Route, Quality Tour and cleaning plan forms — what it means, whether you must fill it, what campOS fills in for you, and what it changes.
The three work forms open from Cleaning Task, Build Route and Quality Tour on Today and Tasks. They open at the side, keep what you typed if you switch language, and end with Cancel and Create. When something is missing the form says how many fields need attention and jumps to the first one.
Only locations with Smart Cleaning turned on (in My Building › Locations) can be chosen. Only people with a cleaner role can be assigned, including as a tour’s inspector.
Cleaning Task
Section titled “Cleaning Task”One job at one place. Sections 4 and 5 open once you choose a location.
| Field | Required | Default and suggestions | What it does |
|---|---|---|---|
| Title | Yes | Filled from a smart list’s name if you add one while the title is empty. | What the cleaner sees as the task’s name. |
| Description | No | — | Extra detail for the cleaner. |
| Work location | Yes | campOS reads the title and description and may pick the location for you (“campOS matched the location: …”) or ask “Is it …?”. | Where the task is. The task appears on that location and on the cleaner’s list. |
| Urgency | No | Medium. If the text sounds like a hazard, campOS sets High and warns you to isolate the area. | Normal, Medium or High. High puts the task in the Urgent column and higher in the cleaner’s list. |
| Service date | Yes | Today | Which day’s Today board shows the task. |
| Start time / End time | Yes | 07:00 – 19:00 | The time window for the work; the start orders the cleaner’s list. |
| Assignee | No | The cleaner with the fewest open tasks today (“Recommended by workload”). | Who does it. With an assignee the task is Assigned, without one Unassigned. |
| Area type | No | Guessed from the location or the text. | Only used to suggest checklists. Not saved on the task. |
| Recommended smart lists | No | campOS may add the best-matching list automatically. | Adds ready-made checklist steps. A list that recommends a photo ticks the evidence box. |
| Checklist | No | Empty | Steps the cleaner must tick. The task can’t be completed until every step is ticked. |
| Completion evidence is required | — | Ticked | The task can’t be completed until a photo is sent and approved. |
Creating saves one task with a number like CLN-1A2B3C4D.
Build Route
Section titled “Build Route”One cleaner’s round for one day.
| Field | Required | Default and suggestions | What it does |
|---|---|---|---|
| Route name | Yes | — | The route’s name on Today and Plan. |
| Recurrence (days) | At least one day | Sunday to Thursday | Saved and shown with the route. campOS does not yet create the route on those days: it is created for today only. |
| Assignee | No | — | One cleaner for every stop. |
| Tasks (stops) | At least one complete stop | One empty stop | Each stop has a title, a work location, an optional description, smart lists, a checklist and Completion evidence is required (ticked). Drag stops into walking order. Stops missing a title or location are dropped when you create. |
Creating saves the route for today and publishes it straight away: every stop becomes a task, in order, assigned to the route’s cleaner. Each stop is given Medium urgency and 20 minutes, with no time window of its own.
Afterwards, editing the route saves on its own. Removing a stop cancels its task; completed stops are never changed. Completed and cancelled routes can’t be edited.
Quality Tour
Section titled “Quality Tour”An inspection of one or more places against criteria.
| Field | Required | Default and suggestions | What it does |
|---|---|---|---|
| Title | Yes | — | The tour’s name, used for every tour task. |
| Tour type | No | — | Restroom round, Lobby audit, Floor sample or Contract compliance audit fill the criteria with a starting list. The type itself isn’t saved. |
| Inspection scope | At least one location | — | One tour task is created per location. |
| Quality criteria, comma separated | Yes | Filled by the tour type | Each criterion becomes a checklist step, and a failed criterion becomes a finding. |
| Scheduled at | Yes | Today 09:00 | When the tour starts. |
| Assignee (inspector) | No | — | Who inspects. Only cleaner roles are listed. |
Every tour task needs a photo; there is no box to turn this off.
Cleaning plan
Section titled “Cleaning plan”Plan › Cleaning Programs › New plan or Edit plan. A plan is a schedule; it creates visits, not tasks.
| Field | Required | Default and suggestions | What it does |
|---|---|---|---|
| Plan name | Yes | — | Unique among the building’s plans. |
| Area type | No | Not set | Stored with the plan; doesn’t change the schedule. |
| Vendor | Yes | The building’s vendor, if it has only one | The vendor responsible. A location without a vendor gets no visits. |
| Recurrence | — | Once a day | How often (see below). |
| Service days | No | Sunday to Thursday | Which days visits fall on. Hidden for monthly and as-needed plans. |
| Starts / Ends | No | 08:00 – 16:00 | The window of every visit, in building time, written like 08:00. |
| SLA, work scope, consumables, notes | No | — | Shown on the plan and its visits for reference. |
| Proof required (Photo proof, Check-off, Execution note) | No | Off | Shown on the plan for reference. They don’t yet make tasks need proof: set that on each task or route stop. |
| Locations | At least one | — | Each location gets its own visits. Unticking one cancels its open visits from today. |
How each recurrence choice lays out visits:
| Recurrence | Visits |
|---|---|
| Once a day, Twice a day, Three times a day, Every 2 hours | One visit per selected day (every day if no day is selected). The times-a-day choices record how many rounds are expected; they still make one visit per day. |
| Once a week / Twice a week / Three times a week | On the first one, two or three selected days (Sunday; Sunday and Wednesday; Sunday, Tuesday and Thursday if none are selected). |
| Every 2 weeks | On the selected days, every other week. |
| Once a month | Once a month, counted from the day the plan was created. |
| As needed (no schedule) | No visits. |
Saving shows how many visits were added and cancelled. Visits are kept 30 days ahead and topped up every night.
Editing a task after it is created
Section titled “Editing a task after it is created”Open the task and choose Edit task details. Changes save on their own; there is no Save button.
- You can change the title, description, location, urgency, date and times, assignee, checklist and evidence box.
- A route stop’s location is locked: change it on the route. Changes made on the route later overwrite a stop task’s details.
- You can’t remove the cleaner from work that has started.
- Completed and cancelled tasks can’t be edited.
- While the title or location is empty, nothing is saved.
