Skip to content
Help
Draft. This page has not been checked against the product yet and may not match what you see.

Plan, visit, route, task: what's the difference?

The four words Smart Cleaning uses for work, explained with one building's lobby — what each one is, who sees it, and how they connect.

Take the main lobby of Tower A.

The plan. In Plan › Cleaning Programs you create a plan called “Public areas · Tower A”: the lobby and the elevators, Once a day, Sunday to Thursday, 08:00–16:00, by your cleaning vendor. You write this once. Nobody cleans a plan.

The visits. As soon as you save, campOS writes down every day the plan promises, for the next 30 days: “Lobby · Sunday”, “Lobby · Monday”, and so on, and the same for the elevators. Each of these is a visit. Visits show you what should happen and whether anyone is covering it. A new visit is Uncovered.

The route. On Monday morning you build a route called “Morning round · Tower A” for Dana: first the lobby, then the elevators, then the restrooms on floor 2. A route is always for one cleaner and one day, and its stops are in the order she should walk them.

The tasks. When the route is created, campOS turns every stop into a task: “Lobby”, “Elevators”, “Restrooms floor 2”, all assigned to Dana. These are what Dana sees on her phone under My Route. She opens each one, ticks its checklist and, if asked, sends a photo. A spill in the lobby at 11:00 is a task too, created on its own with Cleaning Task.

PlanVisitsRouteTasksProof

The plan and its visits say what should be cleaned. The route and its tasks say who does it, in what order, today.

Plan Visit Route Task
What it is A schedule for one or more locations One location on one day of a plan One cleaner’s ordered round for one day One job at one place
Who creates it You, once campOS, 30 days ahead You, each day campOS (from a route) or you (Cleaning Task)
Who sees it Managers Managers, in Plan › Work Schedule Managers; the cleaner sees its tasks The cleaner, on the phone
Has a status No Uncovered, Released, Cancelled Draft, Published Unassigned → … → Completed
Done when Never: it repeats Its location was cleaned that day All its tasks are done Its checklist is ticked and its photo approved
Where Plan › Cleaning Programs Plan › Work Schedule Today, Plan Today, Tasks, the cleaning app
  • A plan creates visits, not tasks. A visit is not given to anyone on its own.
  • A cleaner only gets work from tasks: a single Cleaning Task, or the stops of a route.
  • So to get a plan’s work done, build a route (or create tasks) for the day that covers its locations.
  • The route form also asks which days it runs (Recurrence). Those days are saved and shown with the route, but campOS creates the route only for the day you build it. Build it again for the next day.
  • A Quality Tour creates one inspection task per location; its checklist is the criteria to check.
  • A corrective task is created from a failed criterion on a tour, to fix what the inspector found.