How a building is set up and goes live
The seven onboarding steps, what each one needs, how campOS decides what is missing, and what changes when you activate the building.
Before activation: onboarding
Section titled “Before activation: onboarding”Until a building is activated, opening campOS takes you to the onboarding board. It shows a readiness arc, the next step to do, and What’s missing to go live.
Each step has Save draft and Save and continue, and warns you before you leave with unsaved changes.
| Step | What it holds | Counts as done when |
|---|---|---|
| Property profile | Name, address, city, property type, the buildings with their floors and parking levels, contacts, operating hours. | Name, address, city and property type are filled in. |
| Data source | Import the onboarding workbook, or continue without a file for now. | A file was imported, you chose to continue without one, or the building already has locations or systems. |
| Structure & locations | Buildings, entrances, floors, parking levels, public areas, technical rooms and shared spaces, and which modules use each. | At least one location exists. |
| Building systems | Equipment such as elevators, HVAC and fire safety, with type, criticality, location and vendor. | At least one system exists. |
| Vendors, contracts & certificates | Service vendors, their contracts and SLAs, and certificates with expiry dates. | At least one vendor exists. |
| Maintenance & rounds | Recurring maintenance and inspection rounds: frequency, next date, linked system. | At least one maintenance task exists. |
| Cleaning plan | Cleaning zones: location, zone type, frequency, days and hours. | At least one cleaning zone exists. |
Saving the property profile creates the building, floor and parking-level locations for you. If you import a file, the file’s locations are used instead.
Activating
Section titled “Activating”When you activate, the building goes live: the dashboard, Smart FM and Smart Cleaning open for everyone working in it. On the onboarding board you choose the scope (Activate Smart FM, Activate Smart FM + Cleaning, or Save as draft) and then Confirm and activate. Steps still open stay on the board for later.
After activation: the Setup Center
Section titled “After activation: the Setup Center”Once the building is live, setup moves to the Setup Center, under Settings. It has the same six areas (profile, locations, systems, vendors, preventive maintenance, cleaning) and checks every record against rules:
- Blocking — something the area cannot work without, such as a system with no location.
- Critical — important but not blocking, such as a high-criticality system with no vendor.
- Optional — useful to complete, such as a vendor with no contact person.
An area is Ready when it has records and no gaps, Missing details when it has only non-blocking gaps, Blocked when it has a blocking gap, and Not started when it is empty.
